1st Gold
The gold knowledge library

Gold Resources and Gold Reserves Are Not Synonyms

Gold resources and reserves describe different assessments under a stated reporting framework. Before comparing projects, identify the category, effective date and assumptions so that geological scale is not mistaken for an immediately mineable or profitable holding.

A mineral resource describes a geological concentration assessed under a reporting framework. A mineral reserve is the economically mineable part of an appropriately assessed resource under that framework's conditions. The distinction matters when comparing mining projects.

Read the classification

Confidence categories, assumptions and reporting standards must be identified. A headline that combines categories can conceal different levels of uncertainty. Gold in the ground is not the same as gold that can be profitably extracted under current conditions.

Watch the assumptions change

Prices, costs, recovery, permitting and mine design can affect economic viability. A reserve figure can therefore change without the physical deposit suddenly appearing or disappearing. Consult the technical report and its effective date rather than relying only on a promotional summary. Do not add resources and reserves together unless the reporting basis explicitly supports that calculation. Understanding the categories prevents double counting and helps explain why a large geological estimate is not automatically a valuable operating asset.

Comparing gold resources and reserves tables

Read the table headings and footnotes before adding any figures. Check whether resources are reported inclusive or exclusive of reserves and whether different confidence categories have been combined. If the relationship is unclear, leave the totals separate. A larger combined number is not useful if the calculation counts the same material twice or mixes categories with different meanings.

Record the assumptions that support the estimate, including the reporting basis and relevant economic or technical conditions described in the report. When a later estimate changes, compare those assumptions as well as the headline quantity. Changes can reflect new information or a different assessment basis. A careful comparison explains the category and conditions attached to the ounces, rather than presenting every ounce in a technical table as equivalent.

Continue reading